EVS Manila HQ
Back to Project Portfolio
U.S. Military & Defense

FY-14 USACE – KAB, Repair North Terrace Multiplexes (68 Units)

Comprehensive multi-trade engineering repair and renovation for 68 residential multiplex units at Kadena Air Base North Terrace, including multi-split heat pump condensing units, ceiling cassette fan coils, copper water heaters, and electrical distribution panels.

FY-14 USACE – KAB, Repair North Terrace Multiplexes (68 Units)

Engineering Scope

Coordinated technical deliverables

The project scope brought the listed disciplines into a coordinated design package aligned with the facility’s operational requirements and project program.

  • 68 Residential Multiplex Units HVAC Multi-Split Systems
  • Ceiling Recessed Cassette Fan Coil Upgrades
  • Rheem Water Heater Replacements with Copper Piping
  • Electrical Feeder Panels & Outdoor Condenser Walkways

Planning a similar project?

Share the location, scope, schedule, and available reference documents for an initial technical review.

Request a Proposal